Project Description

Latrobe Equalization Tank –
Long Term Control Plan

Latrobe, PA

OWNER:
Latrobe Municipal Authority

SCOPE OF WORK:

  • Construction of 6.3 million gallon precast/post-tensioned circular equalization tank.
  • Construction of a new pump station and screen room.
  • 80,000 CY of Excavation and Backfill
  • 370 Rock Anchors/Tie-Downs
  • Installation of 12” – 30” sewer lines, vaults, and manholes.